Watermarked studio view. Click image to enlarge. Use thumbs for product / drawing roles.
Product
YP21(Y2) 2,3,4,5,7,10,12,14,16
Browse Civil Circular Aviation Connectors →Engineering reply within 24 hours. Drawing confirmation recommended before release. Need CAD, plating, photos, or reports — include target OEM PN in the RFQ.
Engineering drawings ship with the 24-hour RFQ pack when not published.
No separate drawing pack online for this PN yet.
Request dimensions / pinout for YP21 →All packing and shipment are executed by 86connector Shenzhen warehouse (Shenzhen warehouse — unified dispatch). Shenyang plant is manufacturing capability background only when listed. Batch photos available on request with order confirmation.



| Lead time | 2–4 weeks typical (stock items faster) |
| MOQ | Standard pack — RFQ for small lots |
| Packaging | Export carton + bag/tray |
| Fulfillment | 86connector Shenzhen warehouse — unified export dispatch |
Engineering parameters, downloadable documents, and quality reports. Missing files are fulfilled via RFQ within 24 hours — no fake downloads.
| Part Number | YP21 |
| Series | YP Series |
| Fulfillment | 86connector Shenzhen warehouse — unified export dispatch |
| Lead Time | 2–4 weeks typical (stock items faster) |
| MOQ | Standard pack — RFQ for small lots |
| Packaging | Export carton + bag/tray |
Datasheets and drawings ship with the engineering pack for YP21. Request below — typical reply within 24 hours.
Lot/type test and compliance files. Unpublished items return via RFQ.